Free · no account · no watermark

Construction Change Order Request Form

Download a free construction change order request form with initiating party, reason, requested scope, drawings, estimated price, schedule impact, urgency, attachments, and decision status.

Fillable PDFReviewed 2026-08-21
Add your logo to this construction change order request form

Preview customization free. No account required.
Pro is required to save or export branded documents · $29/month or $249/year.

The download contains no TradesAndForms logo, URL, watermark, or promotion. It is a generic starting point with a fixed structure.

US Letter · PDFFree document preview
AUTHORIZATION

Construction Change Order Request Form

NO. ________
Project notes and follow-upRecord exceptions, attachments, responsible party, and next action.
Purpose

What this construction change order request form is for

Request evaluation of a proposed scope change before it becomes an approved change order.

It captures a request and preliminary impact; the existing change order records the final approved adjustment.

An authorization records permission or a limited acknowledgment. It does not create every term that would normally belong in a full agreement, statutory notice, or jurisdiction-specific waiver.

When to use it—and who completes it

Owners, designers, general contractors, subcontractors, project managers, and field supervisors.

Issue it when a potential change is identified and before changed work proceeds unless emergency authority applies.

The exact signer or reviewer depends on company policy, contract authority, qualifications, and the job. Preserve an issued version when information changes instead of silently replacing the history.

Fields and sections included

The printable, fillable PDF uses the same source definition as this preview. It includes these practical fields:

textDocument number
dateDateRequired
textContractor or companyRequired
textCustomer or responsible party
textProject or propertyRequired
textPrepared by
textContract or job number
textDrawing or specification reference
textRelated contract and request numberRequired
textInitiating partyRequired
textareaReason for requestRequired
textareaRequested scopeRequired
textDrawing, specification, or RFI reference
currencyPreliminary cost impact
numberPreliminary schedule impact in days
dateResponse needed by
textAttachments
textareaDecision and disposition

How to complete the form

Complete the identification fields first, then record the controlling details, exceptions, next action, and approval.

  1. 1

    Identify the correct customer, property, job, and related contract before completing the authorization.

  2. 2

    Record the construction change order request form information from current job records rather than memory or an earlier version.

  3. 3

    Complete the related contract and request number, initiating party, reason for request fields for this specific workflow; attach supporting detail when the available space is not enough.

  4. 4

    Use clear quantities, dates, references, observations, and responsible parties; mark items not applicable instead of leaving ambiguous blanks.

  5. 5

    Review totals, scope boundaries, exceptions, attachments, and required approvals with the people responsible for the next step.

  6. 6

    Save the completed record with the job file and distribute the current version to affected parties.

Before issuing the document, check names, dates, identifiers, totals, references, attachments, and signature blocks. A blank space can be mistaken for an oversight; mark an item not applicable when that is the intended answer.

Fictional example

A completed construction change order request form example

Blue Ridge Contracting uses this construction change order request form for a two-story home addition. It captures a request and preliminary impact; the existing change order records the final approved adjustment. The fictional example identifies the job, records controlling details, notes an exception, assigns follow-up, and obtains the appropriate acknowledgment without presenting the template as an official or universally compliant form.

US Letter · PDFFictional completed example
AUTHORIZATION

Construction Change Order Request Form

NO. ________
Fictional example value
2026-06-19
Blue Ridge Contracting
Juniper Retail LLC
a two-story home addition
Casey Rivera
Fictional example value
Recorded for review
Recorded for review
Project notes and follow-upFictional example for a two-story home addition; verify field conditions and governing requirements before use.

All companies, people, customers, projects, dates, numbers, and contact details shown in this example are fictional and use non-operational example information.

Common mistakes to avoid

  • Using a generic form where statutory language is required
  • Failing to define the limit of the authorization
  • Omitting the related contract, invoice, or scope reference
  • Signing before the effective date or amount is complete
  • Treating acknowledgment as a complete agreement

Storage, follow-up, and handoff

Name the file with the job or property, document type, date, and revision so the current version can be distinguished without opening it. Store it with the related agreement, estimate, report, photographs, correspondence, approval, and invoice—not in a detached downloads folder.

Send the issued record to the people responsible for the next action and record open exceptions with an owner and due date. When an item is resolved, preserve evidence of closure. For long-running logs and schedules, establish who owns updates and how changes are communicated. For signed or certified records, retain the completed copy in the format and period required by the contract, company policy, insurer, manufacturer, or applicable law.

Important limitation

This is a generic starting point, not legal advice. Contract, licensing, notice, cancellation, insurance, and signature requirements vary by jurisdiction and project; consult qualified counsel where appropriate.

Questions about this authorization

Is this construction change order request form really free?

Yes. Download the printable, fillable PDF directly without an account or email address. The file contains no TradesAndForms branding.

Can I add my logo to the free construction change order request form?

Yes. Add your logo, company information, and colors. The document structure remains fixed. Preview this exact form free, then use TradesAndForms Pro to save it and export a branded PDF.

How is this construction change order request form different from related forms?

It captures a request and preliminary impact; the existing change order records the final approved adjustment.

Who should approve the construction change order request form?

Use the approval required by the contract, company authority, customer relationship, insurer, manufacturer, or applicable rule. A generic signature line does not create authority.

Should I use an official form instead?

Yes, whenever a statute, licensing board, permit authority, insurer, manufacturer, contract, or other controlling requirement specifies one. This template is a generic starting point.

How should revisions be handled?

Keep the issued version, identify the revision and date, describe what changed, and distribute the current version to affected parties. Do not overwrite the only copy of an approved or relied-on record.

Brand-only customization

Turn this generic form into your company document.

Add your logo, company information, and colors. The document structure remains fixed.

Preview free. Save and export for $29/month or $249/year.

Add your logo to this construction change order request form